We were fortunate that we only had a couple of days of light rain in the last few weeks. Even with most experts agreeing that untreated lumber can easily withstand the rain that occurs during normal construction periods, any water that stands on floors should be removed as quickly as possible. With the framing nearing the end we are preparing for the arrival of shingles.
Can't Wait
Front Porch - Rocking Chair - Sweet Tea
North side of house
Side entry with small porch and master in the rear
We chose a black architectural shingle
Shingles are complete
No comments:
Post a Comment